BPCS STUDY Client: BPCS Program and design study for a Download Tearsheet> NEWS |
Zoning district investigation to identify the most efficient site for the building
©HTDSTUDIO |
Floorplate conditions / options / configuration. |
Program priorities. |
School construction phasing strategy. |
Staggered Floor System provides assembly space opposite classrooms. Vertical expansion possible to the limit of F.A.R. |
Stacking of classroom suites are designed to allow sunlight into the center of the building |
Students are 'inducted' when entering the school building. |
|